California Public Utilities Code
§ 2836.7
PUC § 2836.7 Effective Jan 1, 2019Div. 1 · Part 2 · Ch. 7.7
Statute text
View on leginfo.ca.govBy June 1, 2018, all of the following shall occur:
(a)(1) The Los Angeles Department of Water and Power shall, in coordination with the city council of the City of Los Angeles, if it chooses to participate, determine the cost-effectiveness and feasibility of deploying, on an expedited basis, a minimum aggregate total of 100 megawatts of cost-effective energy storage solutions to help address the Los Angeles Basin’s electrical system operational limitations resulting from reduced gas deliverability from the Aliso Canyon natural gas storage facility.
(2)If the Los Angeles Department of Water and Power determines pursuant to paragraph (1) that deploying the cost-effective energy storage solutions, as described in paragraph (1), is cost effective and feasible, it shall consider deploying those cost-effective energy storage solutions after June 1, 2018.
…
Legislative history
Amended by Stats. 2018, Ch. 92, Sec. 175. (SB 1289) Effective January 1, 2019.